日日噜噜噜夜夜爽爽狠狠22_中文字幕在线不卡_久久久伦理_久久综合激情网_曰批免费视频播放免费_狠狠做五月爱婷婷综合

position: EnglishChannel  > News> Floating FPSO in South China Sea a First

Floating FPSO in South China Sea a First

Source: Science and Technology Daily | 2024-11-16 08:43:10 | Author: QI Liming

China has launched its first floating production storage and offloading (FPSO) unit. Named the Haikui No.1, it is a self-developed cylindrical FPSO facility, as well as the first cylindrical FPSO put into use in Asia. An FPSO is a floating vessel used by the offshore oil and gas industry to produce and process hydrocarbons and store oil.

Powering high quality development

Officially put into production on September 19, Haikui No.1 weighs a total of 37000 tonnes, towers at a height of about 30 floors, and is 72 meters in diameter. With such a huge area and weight, it looks like a gigantic rice bowl. It has a maximum oil storage capacity of 60,000 tonnes and can also process about 5,600 tonnes of crude oil each day, enough to power 900,000 cars simultaneously.

Haikui No. 1, in collaboration with the deepwater jacket structure Haiji No. 2, has made the re-use of a deepwater oil field in China a reality, extending the production life of the Liuhua Oilfield (China's first self-operated oilfield group, located in the Pearl River Estuary Basin of the South China Sea) by nearly 30 years. On the other hand, it also signals that China has fully mastered the integrated development technology of deep-sea oil and gas engineering over 300 meters, creating a new mode of economic and efficient deepwater oil fields.

"The independent design and construction of Haikui No. 1 not only revitalized the old oilfield that has been in production for decades but also led to the high-quality development of China's offshore oil and gas development engineering equipment industry chain," said Li Da, chief engineer of Engineering Research and Design Institute, China National Offshore Oil Corporation.

Tough and cost-effective contour design

At the beginning of the design stage, the engineers decided that the FPSO should have a large throughput, be cost-effective, and be tough enough to "take root" in the deep waters of the South China Sea, where typhoons are frequent. Through intense brainstorming, a cylindrical FPSO emerged as the best choice.

After settling on the contour of the FPSO, determining the size of the "bowl" was the next challenge.

The R&D team initially planned multiple-scale schemes for periodic motion simulation evaluation. They tried to avoid the main wave frequency and get better hull movement but repeatedly failed. The steep waves in the South China Sea always have a violent pounding effect on the "bowl".

Then, the engineers tried to add a stable "bottom of the bowl" by increasing damping, taking full advantage of the overwhelming resistance of damping on wave excitation. They put a 2.4 metre high damping plate on the "bottom of the bowl" for added stability. Engineers also added zigzag bumps to the damping plate to further release wave energy and improve the damping plate's ability to inhibit heave motion.

Positioning steadily as an anchor

Once the main scale and style had been confirmed, the challenge of securing the cylindrical FPSO had to be overcome. Haikui No.1 can carry more than twice the load of a conventional FPSO in the South China Sea, and its displacement of 100,000 tons is comparable to that of a large aircraft carrier. It is not easy to make it remain perfectly stable in the face of a once-in-a-century super typhoon.

The usual way to solve the positioning problem is to attach a "skirt" to the FPSO. According to this method, the conventional ship type FPSO only needs nine mooring cables, but this "super rice bowl" needs 21, which leads to a significant increase in project costs.

After many demonstrations by the R&D team, under the premise of ensuring stability and security, Haikui No. 1 was firmly anchored with 12 high-strength mooring cables more than 2,500 meters long, so that it could remain steady in the typhoon-ravaged South China Sea. With this method, it is capable to run continuous sea operations for 15 years without the need for docking.

Editor:QI Liming

Top News

Large Unmanned Cargo Aircraft Makes its Debut

China's domestically developed tonne-class large unmanned transport aircraft recently completed its maiden flight in Shandong province, marking a significant advancement in the field of high-end unmanned aviation equipment.

Open Scientific Infrastructure: Catalyst for Intl. Sci-tech Cooperation

It is necessary to promote the opening up and sharing of scientific research infrastructure, make good use of multilateral mechanisms, and establish and improve international open sharing platforms, Chen Jiachang, China’s vice minister of science and technology, said at the Open Science International Forum, part of the 2025 Zhongguancun Forum Annual Conference, on March 28.

抱歉,您使用的瀏覽器版本過(guò)低或開(kāi)啟了瀏覽器兼容模式,這會(huì)影響您正常瀏覽本網(wǎng)頁(yè)

您可以進(jìn)行以下操作:

1.將瀏覽器切換回極速模式

2.點(diǎn)擊下面圖標(biāo)升級(jí)或更換您的瀏覽器

3.暫不升級(jí),繼續(xù)瀏覽

繼續(xù)瀏覽
主站蜘蛛池模板: 麻豆成人网| 亚洲av无码国产精品色软件 | 国产v亚洲v天堂无码 | 爱爱视频久久 | 国产欧美在线观看视频 | 欧美老人与小伙子性生交 | 一本久久a久久精品综合 | 一个人免费在线观看动漫视频www | 一本一道av中文字幕无码 | 一女被三黑人糟蹋 | 日本熟妇xxxx乱 | 亚洲成Av人片在线观看不卡 | 熟妇人妻无码xxx视频 | 8x8×拨牐拨牐永久免费视频 | 国产高清乱码又大又圆 | 免费中文熟妇在线影片 | 粉嫩少妇内射浓精VIDEOS | 18禁超污无遮挡无码免费应用 | 国产精品日本无码久久一老A | 日本无码人妻精品一区二区视频 | 亚洲毛片不卡AV在线播放一区 | 手机在线看片亚洲 | 国产黄色片麻豆 | 久草在线2 | jizzjizzjizz亚洲熟妇 | 福利视频一 | 欧美精品欧美人与动人物牲交 | 国久久 | 美女18禁裸乳裸体无遮挡的网站 | 天天爽亚洲中文字幕 | 亚洲AV综合永久无码精品天堂 | 成人午夜爽A片免费视频 | 欧美牲交A欧美牲交aⅴ久久 | 全部孕妇毛片丰满孕妇孕交 | 亚洲国产一区二区a毛片日本 | 男吃奶玩乳尖高潮视频 | 自拍视频区 | 白丝护士高潮喷水免费网站 | 小荡货好紧好爽A片视频 | 免费做爰猛烈吃奶摸视频在线观看 | 日韩精品一区二区AV在线观看 |